Stem replacement (MTB & Road, external cable/hose routing)

  • release handlebar from stem
  • release of preload bolt from stem
  • release stem from steerer of fork
  • disassembly of stem
  • assembly of new stem
  • tightening preload bolt from stem with torque wrench
  • adjustment/wheel truing
  • tightening stem for steerer of fork with torque wrench
  • tightening handlebar for stem with torque wrench
  • adjustment of the handlebar
  • (+1000 MKD and + 2hours of labor if with internal routing of cables and hoses)